Guides and insights from RPM on finished vehicle logistics, fleet relocation, car shipping, RV and collector car transport, heavy haul, freight shipping, lithium battery compliance and cargo security. Written for OEMs, dealers, fleet managers, shippers and carriers. Newest first; filter by category to narrow the list.
How collector motorcycles and powersport machines should be transported: the three securement methods, why vintage machines need different handling, open versus enclosed, and condition documentation.
30 Aug 2026
Sequencing vehicle delivery against facility readiness milestones rather than an opening date. Covers the readiness gates, why early delivery is the failure mode, the three-wave delivery model, and registration as the critical path.
29 Aug 2026
Moving damaged fleet vehicles from incident site to repair, storage, or disposition. Covers drivable and non-drivable triage, the tow yard storage clock, the first 72 hours, and non-running handling requirements.
27 Aug 2026
The governance layer above individual driveaway moves: driver qualification standards with continuous MVR monitoring, three routing architectures, two-sided scheduling constraints, and program-level compliance.
26 Aug 2026
How in-bond vehicle transport works under 19 CFR Part 18: IT, T&E, and IE entry types, custodial bond requirements, the 30-day and 15-day clocks, EPA and DOT entry forms, and the 2026 electronic bond transmission proposal.
24 Aug 2026
Round-trip transport for classic car rallies and driving tours, including the four-point condition reporting protocol, the unmanaged return leg, support gear, and pre-event preparation.
22 Aug 2026
How international lithium battery shipments comply with the IATA DGR 67th Edition and IMDG Amendment 42-24, including the 2026 state-of-charge mandate, UN number selection, air section limits, and export documentation.
21 Aug 2026
Auction lane selection as an arbitrage calculation: the price gain must clear incremental transport cost plus daily depreciation across the added days. Includes the de-identification constraint and segment-level lane divergence.
19 Aug 2026
Compound dwell is the largest controllable component of door-to-door finished vehicle transit time. How to decompose arrival, processing, and dispatch dwell, separate yard damage from transport damage, and measure what matters.
18 Aug 2026
Ship-thru upfit transport creates two legs and three custody handoffs. How to sequence chassis delivery against upfitter slots, book the outbound leg proactively, and measure the five intervals inside order-to-delivery.
16 Aug 2026